Engineering Grad Students Get Smashed

Summary


LOGAN -- With a piece of a former 4500 South bridge support from eastside I-215, Dave Petty and Parry Osborn, aided with a computer, began applying pressure.

At 140,000 pounds, the bridge piece began to pop and crack.

See the full content of this document

Extract


Engineering Grad Students Get Smashed

At 250,000 pounds, the sounds turned to thuds, and small pieces of concrete began to fly.

At 380,000 pounds, long cracks -- technically cal...

See the full content of this document

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company